FUEL COST ADJUSTMENT (Applicable to Rates R, R(WH), GS, I ,
and LP)
The fuel cost adjustment in dollars per kWh shall be the same
as that recently billed to the Fulton County REMC by its purchase
power supplier, less $.000000 per kWh, such difference to be divided
by one (1) minus the total energy losses of the utility for the
preceding calendar year expressed as a decimal fraction of the total
energy purchased for the same year.
For Current Fuel Cost Charge - See Appendix FC
RATE ADJUSTMENT (Applicable to Rates R, R(WH), GS, I, and LP)
The Rate Adjustment shall be on the basis of a Purchased Power
Cost Adjustment Tracking Factor, occasioned solely by changes in
the cost of purchased power. The Rate Adjustment in dollars per
kWh shall be the same as that recently billed to the Fulton County
REMC by its purchased power supplier. This difference is to be divided
by one (1) minus the total energy losses of the utility for the
preceding calendar year expressed as a decimal fraction of the total
energy purchased for the same year. This amount will be increased
by $0.008806 per kWh to account for the level of power cost currently
reflected in the base rate charges.
NON - FUEL COST ADJUSTMENT (Applicable to Rates R, R(WH), GS,
I , and LP)
The non-fuel cost adjustment in dollars per kWh shall be equal
to the total non-fuel adjustments billed by WVPA divided by the
total kWh purchased during the month. This amount shall be divided
by one (1) minus the total energy losses of the utility for the
preceding calendar year expressed as a decimal fraction of the total
energy purchased for the same year
|